Rooms · Kitchen
Rethinking a closed kitchen so it becomes the room the whole household actually uses.
Location
Clapham, London
Year
2024
Duration
10 weeks
01 — The starting point
What the owners
wanted to change
A small, closed kitchen next to a dining room nobody used. Storage was short and light came from one side only.
02 — What we checked first
Whether the partition was load-bearing, where water and extraction could run, and electrical capacity for new appliances.
Trades involved
Masonry
Plumbing
Electrics
Joinery
Tiling
Before, after,
same viewpoint
Photographed from the same spot, so you can judge the work rather than the camera angle.
FIG. 01 — Before / after
Drag to compare
03 — How we approached it
Three moves,
in this order
Each decision was explained and agreed before the work moved on.
04 — The result
Finish by finish

FIG. 02 — Main room

FIG. 03 — Detail

FIG. 04 — Junction

FIG. 05 — Material

FIG. 06 — Overview